BESCOM Rooftop Solar Application Process – Step-by-Step Guide for Karnataka (2026)

If you live in Bengaluru or nearby regions and are planning to install rooftop solar, understanding the BESCOM Rooftop Solar Application Process is essential. BESCOM (Bangalore Electricity Supply Company Limited) is responsible for approvals, inspections, net metering, and grid connectivity for rooftop solar systems in its service areas.

This guide explains the complete BESCOM rooftop solar process, from application to subsidy credit, in simple language for homeowners.


What Is BESCOM Rooftop Solar Scheme?

The BESCOM rooftop solar scheme allows residential consumers to install grid-connected rooftop solar systems and export excess electricity to the grid through net metering.

BESCOM rooftop solar scheme approval and application overview

This scheme works in coordination with:

  • PM Surya Ghar Muft Bijli Yojana
  • MNRE rooftop solar subsidy programme
  • Karnataka solar net metering regulations

Who Can Apply for BESCOM Rooftop Solar?

Eligible Applicants

  • Residential homeowners in BESCOM jurisdiction
  • Independent houses and villas
  • Residential apartment associations
  • Consumers with valid BESCOM electricity connection
  • Grid-connected rooftop solar systems

Not Eligible

  • Commercial or industrial buildings
  • Off-grid solar systems
  • Consumers with pending BESCOM dues
  • Systems installed without BESCOM approval

BESCOM Rooftop Solar Application Process – Step by Step

Step by step BESCOM rooftop solar application process in Karnataka

Step 1: Assess Your Rooftop & Electricity Usage

Before applying:

  • Ensure sufficient shadow-free rooftop space
  • Check your average monthly electricity bill
  • Decide approximate solar system size (1kW–5kW common)

Step 2: Choose BESCOM-Approved Solar Vendor

BESCOM allows installation only through approved and empanelled solar vendors.

Your vendor will:

  • Conduct site survey
  • Recommend suitable system capacity
  • Prepare technical details
  • Assist with application submission

Step 3: Submit Rooftop Solar Application

The application includes:

  • Consumer details
  • System capacity
  • Vendor details
  • Required documents

Once submitted, BESCOM reviews the application for technical feasibility.


Step 4: Technical Feasibility Approval

BESCOM checks:

  • Existing sanctioned load
  • Grid safety requirements
  • Transformer capacity
  • Location feasibility

After approval, installation permission is granted.


Step 5: Solar System Installation

After approval:

  • Solar panels are installed
  • Inverter and wiring completed
  • Safety equipment fitted
  • Installation photographs documented

Step 6: Apply for Net Meter Installation

The vendor submits a request for net meter installation.

BESCOM:

  • Schedules site visit
  • Installs bi-directional net meter
  • Integrates solar system with grid

Step 7: Inspection & Commissioning

BESCOM officials inspect:

  • Installation quality
  • Safety compliance
  • Meter configuration

After successful inspection, the system is commissioned.


Step 8: Subsidy Credit (If Applicable)

If the installation is under subsidy scheme:

  • Details are verified
  • Subsidy amount is credited directly to homeowner’s bank account
  • Timeline depends on policy and processing

To understand subsidy eligibility in detail, read:
👉 Karnataka Solar Subsidy 2026 – Full Guide for Homeowners


Documents Required for BESCOM Rooftop Solar

  • Latest BESCOM electricity bill
  • Aadhaar card
  • PAN card
  • Bank account details
  • Property ownership proof
  • Vendor and installation details

Full checklist available here:
👉 Solar Subsidy Documents Required in Karnataka


Net Metering Under BESCOM Explained

Net metering allows surplus solar electricity to be exported to the BESCOM grid and adjusted against future bills.

Net metering installation under BESCOM rooftop solar scheme

Benefits include:

  • Lower monthly electricity bills
  • No wastage of excess power
  • Transparent billing system

Learn more:
👉 Karnataka Solar Net Metering Guide


How Long Does BESCOM Rooftop Solar Approval Take?

  • Application review: Few working days
  • Installation: Depends on vendor
  • Net meter installation: As per BESCOM schedule
  • Commissioning: After inspection

Timelines may vary based on location and workload.


Common Problems Faced During BESCOM Solar Approval

  • Incomplete documentation
  • Non-approved vendors
  • Transformer capacity limitations
  • Delay in inspection scheduling

To avoid confusion, many homeowners prefer professional guidance.

👉 Request Free Solar Quote in Karnataka


Frequently Asked Questions (FAQ)

Is net metering compulsory for BESCOM rooftop solar?

Yes, net metering is mandatory for grid-connected systems.

Can apartments apply for BESCOM rooftop solar?

Yes, residential societies can apply under group housing categories.

Can I install solar before BESCOM approval?

No. Installation should begin only after approval.


Official Reference

For official updates and guidelines, visit:
👉 BESCOM Rooftop Solar Scheme Page


Conclusion

Benefits of installing rooftop solar under BESCOM in Karnataka

The BESCOM Rooftop Solar Application Process is structured and homeowner-friendly when followed correctly. By choosing approved vendors and completing each step carefully, residents can install rooftop solar smoothly and benefit from net metering and subsidy support.